In just one day, ZWT deployed 1038 meters of 4” FS LP 750-X Fiber-Reinforced Spoolable flow line for Well No. M-31 at Zaggut Station. The whole operation was supervised by certified NOV installers specifically flown in for this purpose.
LinePipe’s installation was so fast utilizing basic hand tools throughout the deployment of NOV Fiberspar LinePipe’s continuous length; this eliminated nearly 86 connections (and their leak potential) had steel pipe been installed. Only three fittings were required including End Connections. Ease of handling and installation cut overall manpower requirements in half. The new LinePipe flowlines eliminate corrosion-related repair and maintenance costs.
This announcement signals the start of an exciting time for ZWT & NOV Fiber Glass Systems in Libya.
Mr. Iftikhar Ul Haq Managing Director of ZWT said: “We are thrilled to partner with NOV Fiber Glass Systems and have been impressed with their professionalism and technical capability. It is ZWT’s long term solution to have locally trained Certified Technicians installing and servicing our client’s requirements for well hook up and field development.”
Led by a highly-experienced management team who has installed more than 150 plants in Libya over 30+ year period, ZWT is Libya’s leading provider of turnkey water treatment solutions, tanks & pre-fab buildings for past 14 years, and distributor for NOV Fiber Glass Systems composite products including their spoolable Fiberspar LinePipe in Libya.